Austral Pacific producing from Cheal oil field

September 26, 2007

MELBOURNE, Sept. 24 — Austral Pacific Energy has completed commissioning of the small Cheal oil field in the Taranaki basin, onshore New Zealand, and it says the field will be opened officially on Oct. 8.

Commissioning began in early August, and the production facilities have already produced 14,000 bbl of oil and 5.9 MMcf of gas.

The field comprises four active wells plus two more in an advanced planning stage. Proved and probable reserves are put at 2.6 million bbl and about 1.8 bcf of gas.

Operator Austral Pacific holds 69.5%, and Calgary-based independent Tag Oil Ltd., 30.5%.

Comments »

The URI to TrackBack this entry is: http://oilgas.blogsome.com/2007/09/26/austral-pacific-producing-from-cheal-oil-field/trackback/

No comments yet.

RSS feed for comments on this post.

Leave a comment

Line and paragraph breaks automatic, e-mail address never displayed, HTML allowed: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>



Anti-spam measure: please retype the above text into the box provided.

Get free blog up and running in minutes with Blogsome | Theme designs available here