Hydro begins Ormen Lange gas production

September 26, 2007

LONDON, Sept. 13 — Development operator Norsk Hydro AS has started natural gas production from giant Ormen Lange field on the Norwegian continental shelf, with deliveries via the Langeled pipeline. Ormen Lange will meet as much as 20% of the UK’s gas needs.

The field, expected to supply 70 million cu m/day of gas and 50,000 b/d of condensate at peak rate, will position Norway as the world’s second-largest gas exporter after Russia.

Hydro is testing production from the field in the North Sea about 120 km from the Norwegian coastline, until the inaugural ceremony on Oct. 6, so gas flows may vary.

From a depth of 800-1,100 m, the gas is transported by pipeline through demanding subsea terrain to Nyhamna on the island of Gossen in the municipality of Aukra in More and Romsdal. After being processed, the gas will be sent through the 1,200 km Langeled subsea pipeline to Easington on England’s east coast.

Norway currently is the world’s third largest gas exporter, delivering 85 billion cu m/year. When Ormen Lange reaches plateau production in 2010, total gas exports from Norway will increase to 120 billion cu m/year, or 20% of Europe’s gas requirements.

Royal Dutch Shell PLC will assume operatorship from Hydro on Dec. 1.

Contact Uchenna Izundu at uchennai@pennwell.com.

Source:

http://www.ogj.com/display_article/305911/120/ARTCL/none/DriPr/Hydro-begins-Ormen-Lange-gas-production/ 

Comments »

The URI to TrackBack this entry is: http://oilgas.blogsome.com/2007/09/26/hydro-begins-ormen-lange-gas-production/trackback/

No comments yet.

RSS feed for comments on this post.

Leave a comment

Line and paragraph breaks automatic, e-mail address never displayed, HTML allowed: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <code> <em> <i> <strike> <strong>



Anti-spam measure: please retype the above text into the box provided.

Get free blog up and running in minutes with Blogsome | Theme designs available here